Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; plgSystemAridocsviewer has a deprecated constructor in /home3/akhrailway/public_html/plugins/system/aridocsviewer/aridocsviewer.php on line 21

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; AriDocsViewerContentPlugin has a deprecated constructor in /home3/akhrailway/public_html/plugins/system/aridocsviewer/aridocsviewer.php on line 106

Warning: Declaration of AriDocsViewerContentPlugin::replaceCallback($attrs, $content) should be compatible with AriMambotBase::replaceCallback($attrs) in /home3/akhrailway/public_html/plugins/system/aridocsviewer/aridocsviewer.php on line 106
Infrastructures

Infrastructures to be built 392 km

The Awash Woldia / Hara Gebeya railway line will involve the construction of 392km of new rail line, 40km maintenance lines and 18km station lines. It also includes construction of new tunnels, three terminal stations with two platforms, and six intermediate stations with a single platform. The total length of the railway line will thus be 447km.

An operation control tower will also be built exclusively for the line. The overhead catenary will provide electricity for the main railway line, depot and stabling lines. Two maintenance facilities, warehouse, generator rooms, maintenance and painting workshop, mechanical service building, wash services, service and commercial buildings will be constructed adjacent to the railway stations.

System.String[]